Photos

Maintenence program aims to maximize equipment efficiency

Michael Fendley, Base Operations Support contractor, uses a Laser Coupling Alignment Kit for precise equipment alignment inside the 41st Aerial Port building mechanical room July 18, 2014, at Keesler Air Force Base, Miss. This system is utilized as part of the Reliability Centered Maintenance program which evaluates equipment performance piece by piece to determine wear and lifecycle of each item. The goal of the program is to institute the most cost effective plan for maintaining complex systems and minimize equipment failure or downtime. (U.S. Air Force photo by Kemberly Groue)

PHOTO BY: Kemberly Groue
VIRIN: 140718-F-BD983-014.JPG
FULL SIZE: 3.6 MB
Additional Details

No camera details available.

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.