Triangle Vision Final new dormitory rises on student campus
Luis Lopez, left, and Teofilo Islas cut plywood to frame a staircase inside the dorm Jan. 15. Sewer excavation is nearly complete and sanitary sewer installation along Z Street is done. Concrete is being placed and concrete masonary units are being laid on the fourth floor. Z Street is being repaired in preparation for reopening to traffic. (U.S. Air Force photo by Kemberly Groue)